After construction of the top section in 2013, bottom section was built this season to replace an existing 2-seater chairlift in this ski resort. It was commissioned by operating company COS (Olympic Center Szczyrk). Its features include the LEITNER DirectDrive, individual footrests, the CPS rope monitoring system and – like the section built in 2013 – Yellow bubbles.