Two cablecranes for the construction of the 106m-long double-curvature concrete dam with an height of 334m.
Mota Engil – Acciona – Edivisa, ACE appointed Agudio for a complete refurbishment, installation and commissioning of two parallel cablecranes, trusting in the reliability and performances of Agudio equipment.