With the realization of this new inclined elevator, LEITNER has made a key contribution to the modernization of the famous ski jumping hill in Predazzo. The project formed part of the Olympic program for Milan-Cortina 2026 and was geared toward creating the best possible infrastructure for international competition and athlete training. The inclined elevator measures approximately 250 meters in length and links the landing slope with the top with two stops on the way at the coaches platform and the judges’ tower. The system guarantees efficient, safe and all-weather access to the important areas of the ski jumping hill. DEMACLENKO took the opportunity to upgrade the existing snowmaking system during the construction works. The end product is a fully revised ski jumping center that meets the exacting standards of professional competition while also taking long-term operation, efficiency and sustainability into account.