Saltar al contenido principal

Senderbahn

Haus am Ennstal – Austria – 2025

GD10

Tipo de teleférico

2.800

Caudal por hora

6,0 m/s

Velocidad

Resumen

Senderbahn

A further milestone in the development of the 4-Mountain Ski Super Link was achieved with the installation of the new “Senderbahn” at the Hauser Kaibling ski area. The 10-passenger gondola lift from LEITNER is equipped with LeitPilot for autonomous station operation and can transport up to 2,800 passengers per hour, increasing both the capacity and the overall quality of the facilities by a considerable margin. Closed cabins, high wind stability and interior ski racks make for a comfortable ride whatever the weather – a clear benefit for both families and visitors willing to brave any conditions. At an operating speed of up to 6 m/s, the new ropeway reaches the Sender plateau in around five minutes. From there, visitors can reach the highest point of the ski area with just one more lift ride, significantly improving access to central slopes. In the previous year, the 8-seater chairlift “Kaiblinggrat” – also LeitPilot-equipped – was successfully commissioned at Hauser Kaibling.

Estación de valle 1.335 m
Estación de montaña 1.865 m
Potencia (kW) 793 kW
Pilonas 12
530 m Diferencia de altura
1.595 m Longitud
54 Vehículos
2.800 Caudal por hora

PR & News

Artículos relacionados con esta referencia

Comienzo de la nueva temporada con eficiencia: las estaciones de esquí de l...

19.01.2026

En el Ochsenkopf y en Hauser Kaibling empieza la temporada con nuevos remon...

05.12.2024

LeitPilot permite el funcionamiento autónomo de estaciones de telecabinas

12.04.2024

Referencias similares

Telecabinas desembragables

GD10

Trysilgondolen

Trysil – Noruega – 2025

GD10

Côte-Brune

Meribel Mottaret – Francia – 2025

GD10

Francolini

Folgaria – Italia – 2025

GD10

Pila Couis

Pila – Italia – 2025

GD10

Manizales

Manizales – Colombia – 2025

GD10

Lezuo

Livinallongo – Italia – 2025

GD10

Franzin

Karersee – Italia – 2025

GD10

La Crusc I

Abtei - Badia – Italia – 2025

GD10

Marinzen

Kastelruth – Italia – 2025

GD10

Valcigolera

San Martino di Castrozza – Italia – 2024

LEITNER cree en un futuro en el que el movimiento sea fácil, silencioso y limpio.
Solicitar asesoramiento