Scandinavia’s first 3S system
19.03.2018
Neustift (Stubai) – Austria – 2016
Ropeway type
Throughput per hour
Speed
The longest 3S gondola lift in the Alps and the world's first tricable gondola lift in two sections featuring non-stop operation – these are just some of the highlights of the new gondola lift on the Stubai Glacier. The Eisgratbahn gondola lift represents a new generation of technology. Construction was completed in just 16 months and it is the perfect synthesis of innovative technology and modern design. This marks the first appearance of the elegant new “Symphony” cabins based on a concept from Pininfarina. Modern contours, the spacious boarding area, the panoramic windows featuring genuine glass, real leather seats, and Wi-Fi in all cabins ensure a one-of-a-kind ride experience. This ropeway is also the first tricable gondola lift in the world to feature the LEITNER DirectDrive.