Skip to main content

Trebevic

Sarajevo – Bosnia & Herzegovina – 2018

GD10

Ropeway type

1.200

Throughput per hour

5,0 m/s

Speed

Overview

Trebevic

The ropeway to Trebević, the local mountain of the Bosnian capital Sarajevo, was one of the most famous symbols of the 1984 Olympic Games. The system was destroyed during the Yugoslav Wars in the 1990s. Now, more than a quarter of a century later, the new system by LEITNER ropeways is breathing new life into the mountain area. The 10-passenger gondola lift brings tourists and local residents directly from the center of Bosnia’s capital quickly and comfortably to the 1,160 meter summit of Trebević. Inspired by its glory days of this ropeway, five cabins in the Olympic colors red, black, green, blue, and yellow soar to the mountaintop. On April 6, 2018, Sarajevo cele­brated the official opening of its new ropeway – and the return of a true monument.

Valley station 581 m
Mountain station 1.160 m
Power (kW) 370 kW
Towers 10
579 m Height difference
2.158 m Length
33 Vehicles
1.200 Throughput per hour

PR & News

Articles related to this reference

A ropeway as a symbol of peace

06.04.2018

Similar references

Detachable gondola lifts

GD10

Senderbahn

Haus am Ennstal – Austria – 2025

GD10

Trysilgondolen

Trysil – Norway – 2025

GD10

Côte-Brune

Meribel Mottaret – France – 2025

GD10

Francolini

Folgaria – Italy – 2025

GD10

Pila Couis

Pila – Italy – 2025

GD10

Manizales

Manizales – Colombia – 2025

GD10

Lezuo

Livinallongo – Italy – 2025

GD10

Franzin

Karersee – Italy – 2025

GD10

La Crusc I

Abtei - Badia – Italy – 2025

GD10

Marinzen

Kastelruth – Italy – 2025

LEITNER believes in a future in which movement is effortless, quiet and clean.
Request consultation