Skip to main content

Piz Seteur I+II

Wolkenstein – Italy – 2017

GD10

Ropeway type

3.600

Throughput per hour

6,0 m/s

Speed

Overview

Piz Seteur I+II

At the foot of the Sassolungo, LEITNER ropeways built one of the major highlights of the 2017/2018 winter season: the new Piz Seteur gondola lift consists of two sections and sets new standards in comfort, safety and performance. The Symphony 10 cabin, premiered in Val Gardena, offers far more space and a larger entrance area for passengers. The unmistakable Pininfarina design rounds off the package. The extended boarding time in the station (65 seconds), with six opened cabins, give winter sports enthusiasts more time for safe and stress-free embarking and disembarking. The new intermediate station was also designed by Pininfarina, andoffers great benefits thanks to a perfect combination of state-of-the-art Pininfarina designand sophisticated construction. Of course, it also increases passenger comfort.

Valley station 1.800 m
Mountain station 2.113 m
Power (kW) 794 +353
Towers 14 (8 + 6)
313 m (209 + 104) Height difference
1.456 m (970 + 486) Length
80 (50 + 30) Vehicles
3.600 Throughput per hour

Similar references

Detachable gondola lifts

GD10

Trysilgondolen

Trysil – Norway – 2025

GD10

Senderbahn

Haus am Ennstal – Austria – 2025

GD10

Côte-Brune

Meribel Mottaret – France – 2025

GD10

Francolini

Folgaria – Italy – 2025

GD10

Pila Couis

Pila – Italy – 2025

GD10

Manizales

Manizales – Colombia – 2025

GD10

Lezuo

Livinallongo – Italy – 2025

GD10

Franzin

Karersee – Italy – 2025

GD10

La Crusc I

Abtei - Badia – Italy – 2025

GD10

Marinzen

Kastelruth – Italy – 2025

LEITNER believes in a future in which movement is effortless, quiet and clean.
Request consultation