Skip to main content

Ochsenkopf Süd

Fleckl – Germany – 2024

GD10

Ropeway type

1.176

Throughput per hour

6,0 m/s

Speed

Overview

Ochsenkopf Süd

LEITNER reached the first milestone in the ambitious Ochsenkopf project with the installation of a 10-passenger gondola lift in 2023. Now a further 17 million euros of investment has followed to develop the south side of the mountain. The new GD10 “Ochsenkopf Süd” is based on the same concept as the existing 10-passenger gondola lift “Ochsenkopf Nord” and, with the Ochsenkopf home to a German monoskiing association training center, has been specially designed to offer monoskiers the highest possible levels of comfort. Besides the construction of a spacious bottom station with extra-high ceilings, the number of towers has been reduced from 14 to 11 thanks to the latest building methods, ensuring that sustainability and efficiency remain at the forefront of the new system. The ropeway offers step-free access and is equipped with a number of add-ons for summer operation, such as LEITNER bike racks. Another highlight of the ropeway is its sustainable operation. It is powered by a highperformance, 353 kW LEITNER DirectDrive, which ensures maximum energy efficiency. In addition, solar panels with a total output of 200 kWp have been installed on the roofs of the bottom and top stations. In optimum weather conditions, the ropeway can be operated almost entirely by the power of the sun.

Valley station 774 m
Mountain station 1.024 m
Power (kW) 353 kW
Towers 11
249 m Height difference
1.863 m Length
25 Vehicles
1.176 Throughput per hour

PR & News

Articles related to this reference

Ochsenkopf and Hauser Kaibling start the season with new ropeways

05.12.2024

Similar references

Detachable gondola lifts

GD10

Senderbahn

Haus am Ennstal – Austria – 2025

GD10

Trysilgondolen

Trysil – Norway – 2025

GD10

Côte-Brune

Meribel Mottaret – France – 2025

GD10

Francolini

Folgaria – Italy – 2025

GD10

Pila Couis

Pila – Italy – 2025

GD10

Manizales

Manizales – Colombia – 2025

GD10

Lezuo

Livinallongo – Italy – 2025

GD10

Franzin

Karersee – Italy – 2025

GD10

La Crusc I

Abtei - Badia – Italy – 2025

GD10

Marinzen

Kastelruth – Italy – 2025

LEITNER believes in a future in which movement is effortless, quiet and clean.
Request consultation