Skip to main content
Back

Last updated 21.10.2019

The LEITNER ropeways Fleckalmbahn in Kitzbühel: a highlight of the winter season

Austria’s first ropeway to travel at 7 m/s and featuring the world’s first heated seat back

Open cabin with red seats and large windows on a white background
The “Fleckalmbahn” is indisputably sensational: LEITNER ropeways’ new gondola lift, built this year in the popular Tyrolean winter sports resort of Kitzbühel, features technological and design innovations that guarantee unprecedented comfort and sustainability. The 27.5-million-Euro project is the largest-ever individual investment by Bergbahn AG Kitzbühel. On 18 October, Josef Burger, managing director of BBAG Kitzbühel, presented the innovative product during a press conference in Munich.

Following 35 years of accident-free service, 90,000 hours of operation and more than 30 million satisfied customers, the old Fleckalmbahn was respectfully retired on 14 April 2019. LEITNER ropeways will put its replacement, the new Fleckalmbahn, into operation on 6 December 2019, after less than eight months of intensive construction work.

The Symphony 10 cabin with its elegant Pininfarina design will offer the greatest passenger comfort currently available on the market. Its dimensions – depth, width, height, and door width – exceed both those of the old cabin and those of comparable models offered by competitors. The cabin is equipped with ergonomically designed single seats with leather covers and another world’s first: heating elements at lower-back height. Like the cabins, the stations are designed in the Pininfarina style and equipped with an extensive array of functions powered by LEITNER ropeways technology.

The new Fleckalmbahn also proves the company’s commitment to sustainability once again. Its LEITNER DirectDrive system, for instance, saves considerable amounts of energy. The company has also implemented a resource-friendly, speed-driven capacity management system, reduced the number of support towers by a quarter and the amount of cabins by a half while maintaining the same transport capacity, and used compacted and smoothed ropes and rollers with a larger diameter. These measures cut the energy requirements of the system by 75,000 kWh per year, effectively demonstrating technological progress and real-life sustainability.

LEITNER ropeways celebrates its new installation as yet another chapter in its successful partnership with Bergbahn AG Kitzbühel. Martin Leitner, member of the Leitner Board of

Directors, said: “The new Fleckalmbahn is a significant technological milestone in our long-standing partnership with Bergbahn AG Kitzbühel. It is the 18th system we have realized together. This gondola lift epitomizes individuality and elegant design. It is Austria’s first ropeway that can reach a speed of 7 m/s and its newly developed cabins feature additional heating elements in the seat back, which are unique on the market. They guarantee unprecedented ride comfort in the cabin.”

References

Discover the installation in detail

FLECKALMBAHN

Kitzbühel – Austria – 2019

The “Fleckalmbahn” gondola lift in the popular Tyrolean winter sports resort of Kitzbühel features numerous technological and design innovations that guarantee maximum ride comfort and sustainability. The Luxury cabin Symphony 10 with its elegant Pininfarina design offers the greatest passenger comfort currently available on the market. The cabin is equipped with ergonomically designed single seats with leather covers and another world’s first: heating elements at lower-back height. Like the cabin, the stations are designed in the Pininfarina style and equipped with an extensive array of functions powered by LEITNER ropeways technology. The new Fleckalmbahn is a significant technological milestone in our long-standing partnership with Bergbahn AG Kitzbühel.

GD10

Ropeway type

2.590

Throughput per hour

7,0 m/s

Speed

Press

Press area

The LEITNER ropeways Fleckalmbahn in Kitzbühel: a highlight of the winter season

4 Downloads available


Related news

More interesting articles

ROPERA®: Digital Solutions for Efficient Ropeway Operations

19.11.2026

New Operations & Technology Hub

20.10.2026

LEITNER is setting new standards for the future of ropeways in Austria

02.07.2026

LEITNER’s first ROPERA® system in Switzerland is coming to Zermatt

23.06.2026

Above the traffic jams: LEITNER expands Mexico’s ropeway network by a furth...

09.06.2026

LEITNER inaugurates a new client training center in Ratschings

11.05.2026

LEITNER’s innovation push: ROPERA® impresses experts at Mountain Planet 202...

16.04.2026

Innovative Premiere: From 2027, the world’s first aerial tramway with Direc...

17.03.2026

LEITNER launches major technology initiative at Mountain Planet 2026

05.03.2026

LEITNER ropeways are setting new trends in many regions of Europe

20.02.2026

Download files

General Terms and Conditions

By using this content, you agree to the Terms of Use as well as to providing correct copyright attribution.

Download files

Download