Skip to main content
Back

Last updated 04.09.2025

LEITNER’s next flagship project for the Matterhorn Ski Paradise

New for winter 2025/26: 8-seater chairlift to the Gifthittli, featuring premium design

Cable car station in a snowy mountain landscape with Matterhorn in the background
With an incredible 322 kilometres of slopes reaching an altitude of almost 4,000 metres, the Matterhorn Ski Paradise is one of the world’s most renowned and impressive skiing areas. With the “Matterhorn Alpine Crossing”, LEITNER has already completed two spectacular prestige projects in recent years, including the highest ropeway crossing in the Alps. Now comes the next major project: from the 2025/26 winter season, the first 8-seater chairlift by the South Tyrolean manufacturer in Switzerland, will ensure fast and luxurious transport along the route between Riffelberg and Gifthittli – all this including sustainable implementation and high-end design.

Starting next season, the new system will replace a LEITNER 6-seater chairlift that has been in operation since 2003, and was one of the most high performance ropeways of its time. This continues the process of modernization, that began with the construction of the Matterhorn Glacier Ride I and II, including Europe’s highest top station, which was a technological and structural highlight, in this superlative ski resort.

The replacement of the 22-year-old Gifthittli ropeway will take winter sports enthusiasts to their destination in just 5 minutes, transporting up to 3,400 passengers per hour. LEITNER has once again placed a strong focus on sustainability in the construction of the 1.8-kilometre-long facility. Among other things, solar panels for sustainable energy generation will be installed at the stations, and new tower bases will be adapted to allow the existing tower foundations to be reused.

This reduces the impact on nature to an absolute minimum, while at the same time significantly reducing the consumption of materials and resources. As to be expected, the Zermatt project also focuses on high-quality, comfortable furnishing details, and an exclusive design in the high-end version. The new 8-seater chairlift “Gifthittli” will showcase stations in the striking design from the Italian design studio Pininfarina, and offer features such as the LEITNER DirectDrive, individual footrests, and protective hoods.

A strong partnership

“Our many years working with LEITNER, including on the construction of the world’s highest 3S ropeway on the Klein Matterhorn, have convinced us of the company’s excellent collaboration and innovative power. LEITNER’s ability to cater to our individual requirements was a decisive factor,” explains Fabian Imboden, member of the board of Zermatt Bergbahnen and Head of Technology North.

References

Discover the installation in detail

Gifthittli

Zermatt – Switzerland – 2025

At Matterhorn Ski Paradise, a new 8-seater chairlift was realized to significantly improve the route from Riffelberg to Gifthittli. The ropeway reduces journey times, increases capacity and has been systematically designed to operate sustainably. Solar panels provide an additional source of energy generation, while the reuse of existing tower foundations and the installation of the gearless LEITNER DirectDrive reduces both energy consumption and noise levels. The route measuring more than 1.8 kilometers in length is served by 78 Premium Chairs EVO, which are equipped with individual footrests and protective hoods, offering a high level of ride comfort even in challenging weather conditions. The chairlift can transport up to 3,400 passengers per hour and provides significant relief for the highly frequented sections of the ski area. In addition to LEITNER DirectDrive, the ropeway also features the LeitControl control system and LeitPilot for autonomous station operation. Crafted in Pininfarina’s unmistakable Italian design language, the stations feature soaring roofs that blend seamlessly into the surrounding Alpine landscape.

CD8C

Ropeway type

3.400

Throughput per hour

6,0 m/s

Speed

Press

Press area

LEITNER’s next flagship project for the Matterhorn Ski Paradise

2 Downloads available


Related news

More interesting articles

ROPERA®: Digital Solutions for Efficient Ropeway Operations

19.11.2026

New Operations & Technology Hub

20.10.2026

LEITNER is setting new standards for the future of ropeways in Austria

02.07.2026

LEITNER’s first ROPERA® system in Switzerland is coming to Zermatt

23.06.2026

Above the traffic jams: LEITNER expands Mexico’s ropeway network by a furth...

09.06.2026

LEITNER inaugurates a new client training center in Ratschings

11.05.2026

LEITNER’s innovation push: ROPERA® impresses experts at Mountain Planet 202...

16.04.2026

Innovative Premiere: From 2027, the world’s first aerial tramway with Direc...

17.03.2026

LEITNER launches major technology initiative at Mountain Planet 2026

05.03.2026

LEITNER ropeways are setting new trends in many regions of Europe

20.02.2026

Download files

General Terms and Conditions

By using this content, you agree to the Terms of Use as well as to providing correct copyright attribution.

Download files

Download