Skip to main content
Back

Last updated 01.06.2022

LEITNER now makes bike transport by chairlift even easier

New transport systems create maximum flexibility for all bike adventure- seekers

Gondola lift station in a snowy mountain landscape with rocky peaks
Today, more than ever before, ropeways have to impress for their maximum functionality for all types of use. LEITNER, with its two new systems, is now setting the standard for flexibility, safety and comfort for all those who want to enjoy the mountains on two wheels. The transport solutions designed for chairlifts vary depending on the design of the chairlift - with or without bubble - and can be quickly and easily integrated. Add-ons, such as the bike box, make it possible for bikers to try the transport solution before boarding and get all the necessary information they need for a smooth ride.

The ease of use and assembly make the new systems attractive add-ons that transform chairlifts into a perfectly sophisticated means of transport for bikes in just a few easy steps. On chairlifts without bubbles, the bike mount is fastened to the frame of the chair, keeping the loaded vehicle perfectly balanced and preventing it from swinging to one side. Since there are no direct points of contact between the chair and the bike, the latter is perfectly protected from shocks or becoming dirty during the ride. For chairlifts without bubble, the structure made of CE-certified aluminum is available in different versions: Up to two bike racks can be installed on 4-seater chairs, up to three on 6-seater chairs and up to four on 8- seater chairs.

For chairlifts with bubbles, LEITNER uses its specially designed transport vehicle to carry the bikes. It can be hooked on without great effort and transports up to four bikes. To ensure stress-free and safe unloading at the top station, the transport carrier is stopped in the station in stop & go operation.

Getting acquainted with the Bike Box

The Bike Box, developed by LEITNER as a test station allows bikers to “get to know” how the new transport technology works. The box can be set up near the ropeway boarding area, offering the opportunity to practice handling before boarding. In addition to the boarding procedure, bikers will also find information on the requirements for the bike to ensure safe transport. To make the boarding procedure even easier to understand, the box also features pictograms. Alternatively, a screen can be integrated into the box to display the appropriate explanatory video for the procedure.

First reference projects to be kicked off are a complete success

Operators at Geisskopf in the Bavarian Forest and Plan de Gralba, in Val Gardena, Italy, have already tried their hand with the new bike transport systems from LEITNER.

In Italy, an existing 8-seater chairlift (CD8C Gran Paradiso) with bubbles was retrofitted with seven transport vehicles.

Statement by Igor Marzola (Managing Director, Piz de Sella S.p.A.) CD8C Gran Paradiso

"Due to growing demand to use our chairlift also for bike transport in summer, we decided to retrofit the LEITNER bike transport vehicle in 2021. Thanks to this investment, we can now transport 4 times as many bikes and significantly reduce the waiting time for bikers and the effort for our lift staff. The transport vahicle allows guests to load their bikes on their own and without any problems, and to unload them again quickly and easily when they get off the lift. This system has helped us, among other things, to become a bike destination and to offer an excellent service for our guests.”

The 6-seater chairlift at Geisskopf (CD6 Geisskopf), on the other hand, was equipped for bikers right from the start. The installation on this popular leisure mountain is able to offer transport of up to six walkers or up to three bikers and two walkers per chair. This means that the Geisskopf now offers the ideal conditions to enjoy the many downhill routes comfortably and to the full.

Statement by CD6 Geisskopfbahn owner Franz Dominik Frhr. v. Poschinger-Bray

"Since 95% of our summer guests are bikers, we wanted to make a new investment especially in this sector and LEITNER offered us a perfect overall concept. A high-quality, stable and durable bike rack was one of the main criteria when deciding on the project. Furthermore, the LEITNER control unit, which was customized to our needs, was convincing, allowing our passengers to easily load and unload as well as ensuring a trouble-free switch between winter and summer operation. The adaptation of a "Bigline” to transport particularly large bicycles with a long wheelbase was also quickly realized with the LEITNER team. The feedback from guests has been enormously positive and we are very satisfied with the implementation of this project, and with LEITNER as an extremely competent partner.”

References

Discover the installation in detail

GEISSKOPFBAHN

Bischofsmais – Germany – 2020

By choosing a LEITNER 6-seater chairlift, the operators of the Geisskopf ropeway in the Bavarian Forest have made a strong modernizing statement after more than 50 years, and can now offer a comfortable connection that is perfectly tailored to the needs of Geisskopf’s visitors. The new bottom station featuring 90-degree entry is situated at the foot of the family slope and blends harmoniously into its surroundings on account of its attractive, sustainable wood and glass design. In summer, the ropeway provides transport for up to six walkers or up to three bikes and two walkers per chair. This is a significant improvement for bikers, who often used to have to put up with very long queues. There are a number of new ways of using the lift in winter too, when skiers and tobogganers can ride together on one chair along with their sports equipment (one or two tobogganers plus one to four skiers/snowboarders).

CD6

Ropeway type

2.400

Throughput per hour

5,0 m/s

Speed

Gran Paradiso

Plan De Gralba – Italy – 2016

Having installed a 6-seater chairlift in the 2015/16 season, Piz Sella AG invested in infrastructure again for this winter. The new Gran Paradiso chairlift is the first 8-seater chairlift with seat heating in Italy. Piz Sella AG has been working with LEITNER ropeways since the ski resort first opened. They chose the modern LEITNER Premium Chair for this project. Inspired by automotive design and featuring genuine leather seats, it will be a real highlight of the ski resort. The seats are also equipped with individual footrests and blue bubbles. The blue color reflects Piz Sella AG’s corporate color and is a direct reference to the Comici mountain hut, whose design is dominated by the color blue.

CD8C

Ropeway type

2.800

Throughput per hour

5,0 m/s

Speed

Press

Press area

LEITNER now makes bike transport by chairlift even easier

13 Downloads available


Related news

More interesting articles

ROPERA®: Digital Solutions for Efficient Ropeway Operations

19.11.2026

New Operations & Technology Hub

20.10.2026

LEITNER is setting new standards for the future of ropeways in Austria

02.07.2026

LEITNER’s first ROPERA® system in Switzerland is coming to Zermatt

23.06.2026

Above the traffic jams: LEITNER expands Mexico’s ropeway network by a furth...

09.06.2026

LEITNER inaugurates a new client training center in Ratschings

11.05.2026

LEITNER’s innovation push: ROPERA® impresses experts at Mountain Planet 202...

16.04.2026

Innovative Premiere: From 2027, the world’s first aerial tramway with Direc...

17.03.2026

LEITNER launches major technology initiative at Mountain Planet 2026

05.03.2026

LEITNER ropeways are setting new trends in many regions of Europe

20.02.2026

Download files

General Terms and Conditions

By using this content, you agree to the Terms of Use as well as to providing correct copyright attribution.

Download files

Download