Skip to main content
Back

Last updated 16.12.2025

Kicking off a new season packed with innovation!

Italy’s skiing areas rely on top technologies from LEITNER for maximum efficiency

Cable car cabin above a snowy mountain landscape in the Dolomites
Ropeway operators in Italy are announcing a whole host of new developments ahead of the upcoming winter season, relying on LEITNER’s innovative product portfolio. In addition to Italy’s first new 10-seater gondola lift with LeitPilot, key projects include the commissioning of the new “Bernhard Glück” 6-seater chairlift in the Speikboden skiing area in South Tyrol. It is the first facility in the world built according to LEITNER’s new ROPERA® standard for monocable uni-directional ropeways.

With ROPERA®, LEITNER has advanced the previous standard for monocable uni-directional ropeways in a fundamental way. All core components, from the chassis and the grip to the station mechanics and controls, have been optimized for maximum performance, energy efficiency, modular design, noise minimization, occupational safety, and service-friendly maintenance processes. The implementation of this standard on the “Bernhard Glück” 6-seater chairlift this winter season, is a world first. The facility replaces an existing 4-seater chairlift in the Speikboden skiing area in the Ahrntal Valley in South Tyrol and will transport up to 2,400 people per hour in 61 chairs over a distance of 1,252 meters.

New gondola lifts for a more comfortable mountain experience

To kick off the season, numerous Italian skiing areas are putting new gondola lifts into operation. These include the GD10 “La Crusc 1” in Alta Badia, which now takes passengers up from the valley to the historic church of La Crusc in the middle of the skiing area. The facility, which can be used all year round, covers a distance of more than two kilometers. 57 cabins with seat heating and panoramic doors ensure quiet, fast transport at a speed of six meters per second, regardless of the weather – a clear improvement in comfort, especially for families.

In the neighboring Fassa Valley, the new 10-seater “Lezuo” gondola lift along the Sellaronda contributes to an important increase in capacity. It connects the Pordoi Pass with the Fassa Valley and boasts an impressive capacity of 3,400 people per hour.

The modernization of the infrastructure is also progressing apace in the Pila skiing area in the Aosta Valley. The 10-seater “Couis – Platta de Grévon” gondola lift, which transports passengers from Couis to the Stella di Pila mountain hut, was already completed last year. The facility forms the upper section of the connection from Aosta to the highest point of the skiing area. The gondola lift from Pila to Couis has now also been completed, ready for this season. Together with the 8-seater gondola lift from Aosta to Pila, the facility now enables passengers to reach the panoramic restaurant at an altitude of over 2,700 meters in just 30 minutes from the town.

There has also been a push for innovation in the Folgaria skiing area on the Alpe Cimbra, in Trentino. The new 10-seater “Francolini” gondola lift replaces an outdated 2-seater chairlift and enhances the region’s year-round tourist appeal. The facility is designed to transport 2,000 people per hour at a speed of six meters per second and has 57 cabins.

LeitPilot ensures autonomous station operation in the Eggental valley in South Tyrol

In the Carezza skiing area, the 10-seater “Franzin” gondola lift creates a continuous connection between Welschnofen and the Karerpass. The new facility runs from the Hotel Moseralm directly to the Franzin Alm, at an altitude of 1,739 meters, eliminating a previous bottleneck in the Carezza skiing area. The 10-seater gondola lift is equipped with the latest Leitner technologies, including LeitPilot at the top station. The system enables autonomous, unmanned station operation, which, in combination with the LEITNER DirectDrive, also optimizes energy consumption. The lift covers a distance of 1.2 kilometers and transports up to 2,400 people per hour.

Florian Eisath, CEO of Carezza Dolomites, comments on the new gondola-lift: “The new 10-seater Franzin gondola lift represents a significant leap in the quality of our infrastructure and makes daily skiing activities even more comfortable and efficient for our visitors. We are particularly proud of the state-of-the-art technologies used: the autonomous station operation with LeitPilot and the energy-efficient LEITNER DirectDrive set new standards in terms of safety, sustainability, and operational quality. The collaboration with LEITNER has been professional, reliable, and cooperative from the outset, offering genuine benefits for our skiing area and our visitors.”

The new 10-seater gondola lift from Kastelruth to the Marinzen recreation area, which has been in operation since the summer, provides the same capacity. In place of the old chairlift, passengers now benefit from 45 spacious Diamond EVO X-Line Deep cabins with panoramic windows offering breathtaking views of the Dolomites.

The skiing areas of Alta Badia in South Tyrol and Artesina in Piedmont have also installed new 6-seater chairlifts. While the construction of the new CD6 “Forcelles” in Calfosch marks another step in the long-standing collaboration with LEITNER, the new CD6 “Turra – Cima Durand” improves access to the Turra plateau. Equipped with LEITNER DirectDrive, the lift transports up to 2,700 passengers per hour and has 82 chairs for the 1,500-meter-long route.

Two new 4-seater chairlifts help make the use of existing routes more efficient. The CF4 “Valle dei Nibbi” will replace an outdated facility in the Campo Felice skiing area in the Apennines, while the CF4 “Gilberti” in Sella Nevea continues the long-standing collaboration with Promoturismo.

New inclined elevator for ski jumping competitions at the 2026 Olympic Games

With a new inclined elevator, LEITNER is providing an essential element for the modernized, competition-ready infrastructure of the ski jumping hill in Predazzo. The project is part of the preparations for the 2026 Winter Olympics in Milan-Cortina. The IE20 “Predazzo” leads right from the landing area to the tower via two intermediate stations at the judges’ tower and the coaches’ section.

Five new surface lifts round off the comprehensive construction program, improving low-threshold access to village lifts and thus making an important contribution to promoting young talent and regional ski sport development.

References

Discover the installation in detail

Predazzo

Predazzo – Italy – 2025

With the realization of this new inclined elevator, LEITNER has made a key contribution to the modernization of the famous ski jumping hill in Predazzo. The project formed part of the Olympic program for Milan-Cortina 2026 and was geared toward creating the best possible infrastructure for international competition and athlete training. The inclined elevator measures approximately 250 meters in length and links the landing slope with the top with two stops on the way at the coaches platform and the judges’ tower. The system guarantees efficient, safe and all-weather access to the important areas of the ski jumping hill. DEMACLENKO took the opportunity to upgrade the existing snowmaking system during the construction works. The end product is a fully revised ski jumping center that meets the exacting standards of professional competition while also taking long-term operation, efficiency and sustainability into account.

IE25

Ropeway type

200

Throughput per hour

Forcelles

Kolfuschg – Italy – 2025

CD6

Ropeway type

2.600

Throughput per hour

5,0 m/s

Speed

Bernhard Glück

Sand in Taufers – Italy – 2025

The Speikboden ski area in Valle Aurina reached an international milestone in ropeway technology in the shape of the 6-seater chairlift “Bernhard Glück”. The system is the first in the world to be built according to the new ROPERA® standard for monocable uni-directional ropeways. Replacing an existing 4-seater chairlift, it raises capacity, efficiency and comfort to an entirely new level. The high-tech chairlift with Pininfarina-designed stations is equipped with gearless LEITNER DirectDrive, which makes for particularly quiet, energy-efficient and low-maintenance operation. A total of 61 Premium Chairs EVO operate along the 1.2-kilometer route and are able to transport up to 2,400 passengers per hour, reducing waiting time and improving access to the main slopes considerably.

CD6C

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Francolini

Folgaria – Italy – 2025

GD10

Ropeway type

2.000

Throughput per hour

6,0 m/s

Speed

Lezuo

Livinallongo – Italy – 2025

Since commencing operation in the 2025/26 winter season, the new 10-passenger gondola lift “Lezuo” has noticeably accelerated the flow of visitors to the popular Sellaronda. The ropeway realized by LEITNER links the Passo Pordoi directly to the Val di Fassa, creating a new high-capacity connection in the high Alpine region. The 10-passenger gondola lift is equipped with the gearless LEITNER DirectDrive and stands out with its quiet, energy-efficient and low-maintenance operation. Able to transport up to 3,400 people per hour, the ropeway is a main contributor to reducing waiting times and spreading passenger flows more evenly. It uses a total of 55

GD10

Ropeway type

3.400

Throughput per hour

6,0 m/s

Speed

Marinzen

Kastelruth – Italy – 2025

The new 10-passenger gondola lift connecting Castelrotto with the popular Marinzen recreation area has been in operation since summer 2025. It replaces an existing chairlift and offers guests a significant upgrade when it comes to comfort, weather protection and ride quality. On their way to the top, passengers can savor breathtaking panoramic views of the Dolomites, which make the journey itself part of experiencing the unique landscape. The ropeway operates using 45 exclusive Deep Panorama versions of the Premium Cabins Diamond EVO, which wow visitors with their large windows and high-quality fittings. Measuring over 1.6 kilometers in length and with the capacity to transport up to 2,400 people per hour, the system also plays a major role in easing congestion at peak times. The modern gondola lift not only improves access to the recreation area, it also provides a boost to year-round use.

GD10

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Franzin

Karersee – Italy – 2025

In the Carezza ski area in South Tyrol, a new link has been created between Nova Levante and the Passo di Costalunga in the shape of the GD10 “Franzin”. The 10-passenger gondola lift runs from the Hotel Moseralm to the Franzin Alm at 1,739 meters above sea level, removing a previous visitor bottleneck. The ropeway cuts journey times and significantly improves access. It is also equipped with the latest LEITNER technology, including LeitPilot for automated station operation at the top station. This, combined with the gearless LEITNER DirectiDrive system, further reduces the system’s energy requirements and ensures particularly efficient, quiet and low-maintenance operations. The new gondola lift can transport up to 2,400 passengers per hour over its length of around 1.3 kilometers. It plays a significant role in easing the pressure on central transport hubs, while also supporting the Carezza ski area’s sustainable development efforts. In the Carezza ski area in South Tyrol, a new link has been created between Nova Levante and the Passo di Costalunga in the shape of the GD10 “Franzin”. The 10-passenger gondola lift runs from the Hotel Moseralm to the Franzin Alm at 1,739 meters above sea level, removing a previous visitor bottleneck. The ropeway cuts journey times and significantly improves access. It is also equipped with the latest LEITNER technology, including LeitPilot for automated station operation at the top station. This, combined with the gearless LEITNER DirectiveDrive system, further reduces the system’s energy requirements and ensures particularly efficient, quiet and low-maintenance operations. The new gondola lift can transport up to 2,400 passengers per hour over its length of around 1.3 kilometers. It plays a significant role in easing the pressure on central transport hubs, while also supporting the Carezza ski area’s sustainable development efforts.

GD10

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Press

Press area

Kicking off a new season packed with innovation!

10 Downloads available


Related news

More interesting articles

ROPERA®: Digital Solutions for Efficient Ropeway Operations

19.11.2026

New Operations & Technology Hub

20.10.2026

LEITNER is setting new standards for the future of ropeways in Austria

02.07.2026

LEITNER’s first ROPERA® system in Switzerland is coming to Zermatt

23.06.2026

Above the traffic jams: LEITNER expands Mexico’s ropeway network by a furth...

09.06.2026

LEITNER inaugurates a new client training center in Ratschings

11.05.2026

LEITNER’s innovation push: ROPERA® impresses experts at Mountain Planet 202...

16.04.2026

Innovative Premiere: From 2027, the world’s first aerial tramway with Direc...

17.03.2026

LEITNER launches major technology initiative at Mountain Planet 2026

05.03.2026

LEITNER ropeways are setting new trends in many regions of Europe

20.02.2026

Download files

General Terms and Conditions

By using this content, you agree to the Terms of Use as well as to providing correct copyright attribution.

Download files

Download