Skip to main content
Back

Last updated 16.11.2018

Italy’s ski areas rely heavily on modern gondola lift projects

Sixteen new winter sports facilities from LEITNER ropeways between Abruzzo and South Tyrol

Gondola station at 3 Zinnen Dolomites in the snow
The growing trend towards new gondola lifts in European ski resorts can also be seen in Italy. In addition to significant performance improvements relating to safety, comfort and capacity, additional offers in the ski resorts are often included, too. As a result, new transportation projects result in additional ski slopes, extended operating hours and other uses. In time for the upcoming winter season, LEITNER ropeways implemented modern projects in Italy that also increase attractiveness.

Connecting the two existing ski resorts at Passo Resia, South Tyrol, has created a unified year-round area that perfectly complements and shares the strengths of Belpiano in winter and Malga S. Valentino in summer. This will be achieved through the clever positioning of LEITNER ropeways’ two new 10-passenger gondola lifts. The "GD10 St. Valentin-Schöneben" runs from the village of San Valentino via a middle station to the Belpiano ski area. In addition, the "GD10 Höllental" gondola lift makes it possible to travel on from the upper station in Belpiano.

The Gitschberg-Jochtal ski resort will also benefit from a new 10-passenger gondola lift from LEITNER ropeways this winter season. This new lift provides access to more slopes that are perfect for families and leisure skiers, as well as experienced winter sports enthusiasts. The new “Ski Express” gondola lift will travel two kilometers from the valley station approximately 200 meters below directly to the Gitschhütte mountain inn. Modern gondolas will feature sliding doors with fixed side panels along the lateral front, thereby offering passengers plenty of space and a spectacular view

through the panoramic windows.

New project at home: great vision for Three Peaks Dolomites

Further changes have been made to the home of LEITNER ropeways, too. The company has built the “Panoramalift” Telemix system at Monte Cavallo near Vipiteno, replacing a 30-year-old chairlift. The combination of 6-seater chairs and 8-passenger cabins not only increases the capacity of the new facility, but its functionality as well. This ensures the system offers maximum flexibility for different needs: while seasoned skiers can wear their skis to travel on comfort chairs thus allowing them to return to the slopes as quickly as possible, children and pedestrians are transported comfortably and safely in modern gondolas. Telemix systems are ideal in summer too as the facility can also be operated without chairs. This aspect is particularly

important for the Panoramalift at Monte Cavallo since hikers and paragliders can be transported as quickly and comfortably as possible in summer.

A new era is dawning in the “Three Peaks Dolomites” ski area. After more than 40 years in operation, the nostalgic “Mittelstation” two-seater chairlift has been replaced by a new detachable 6-seater chairlift from LEITNER ropeways. The facility features elegant premium chairs with a bubble and heated seats, and will be particularly comfortable for the ski resort’s youngest guests: the child-friendly boarding conveyor belt – which can be raised and lowered depending on the child’s height – will ensure boarding is as easy and comfortable as possible for young skiers. The new “Mittelstation” facility is the first step in an ambitious expansion plan for this well-known ski resort.

Further transportation projects bring modern skiing pleasure

Changes are also afoot at the Alpe di Siusi: the modern, comfortable “Mezdi” 6-seater chairlift has replaced the old 2-seater chairlift in the Piz area. This will provide more comfortable and faster access to the area’s beautiful pistes. The new stations feature the “Pininfarina” design and the facility is also operated using the environmentally friendly and cost-saving LEITNER DirectDrive system. “From four to six” is the motto for increasing capacity in Alta Badia, a ski resort where LEITNER ropeways have been present for over 70 years. The new “Roby” 6-seater chairlift is replacing the existing 4-seater chairlift, therefore providing comfortable and fast transportation. Things will also be much faster in future in San Martino di Castrozza – Passo Rolle. From next season, skiers will be transported from San Martino di Castrozza to Valbonetta in the Trentino ski resort – part of the “Dolomiti Superski” area – in only six minutes, all thanks to the new “Colbricon Express” 10-passenger gondola lift from LEITNER ropeways.

The new 8-passenger gondola lift in Champuloc, northern Italy, not only serves the ski resort but is also used as public transport. With extended operating hours from 7.30 a.m. to 11 p.m., it provides an environmentally friendly connection to the higher villages in the Ayas Valley while also acting as a feeder for the “Monterosa Ski” ski resort. Furthermore, two new 6-seater chairlifts from LEITNER ropeways in the “Melette 2000” ski resort to the north of Asiago and “Pinzolo” in the Val Rendena in Trentino are utterly state-of-the-art. A new 4-seater chairlift has been built in the Tarvisio ski resort in Friuli Venezia Giulia in the province of Udine.

Surface lifts have been constructed in South Tyrol, Abruzzo and Veneto to make it easier for children to learn to ski.

References

Discover the installation in detail

Rosskopf

Sterzing / Vipiteno – Italy – 2022

A new ropeway era began at Rosskopf in Sterzing in December 2022. Very near to LEITNER’s headquarters, the resort’s 6 passenger gondola lift, which was commissioned right back in 1987, has now been replaced by a modern 10 passenger gondola system. The GD10 Rosskopf travels along exactly the same route, including the wellknown crossing of the Brenner freeway, and has been equipped with the eco-friendly, maintenance-friendly LEITNER DirectDrive and new Premium Diamond EVO Premium cabins. This ropeway is especially quiet and easy on resources due to its direct drive system. Its 65 cabins offer exceptionally comfortable seating and a unique, all-round viewing experience. New buildings and architectural touches have been included. New stations buildings were completed at the top and bottom of the ropeway when the gondola lift was built. The bottom station also has space for new offices for Sterzing Tourist Board.

GD10

Ropeway type

2.300

Throughput per hour

6,0 m/s

Speed

St. Valentin - Schöneben

Graun im Vinschgau - Curon Venosta – Italy – 2018

Ideally located on the borders with Austria and Switzerland, the South Tyrolean ski resorts of Haideralm and Schöneben were joined up with one another. Thanks to the new gondola lift they achieved a significant expansion to the range of services in terms of quality and quantity and, at the same time, allowing the area to be used all year round. The "GD10 St. Valentin-Schöneben" runs from the village of San Valentino via a middle station to the Belpiano ski area. A special feature of the new 10-passenger gondola lift is its length: at 4.3 kilometers, the system is one of the longest of its kind.

GD10

Ropeway type

1.600

Throughput per hour

6,0 m/s

Speed

Ski Express

Mühlbach - Rio di Pusteria – Italy – 2018

The Gitschberg-Jochtal ski resort benefits from a new 10-passenger gondola lift from LEITNER ropeways. This new installation pro­vides access to more slopes that are perfect for families and leisure skiers, as well as ex­perienced winter sports enthusiasts. The new “Ski Express” bottom station was built 200 m below the old one and reaches now after two kilometers the Gitschhütte mountain lodge. Modern cabins feature sliding doors with fixed side panels along the lateral front, thereby of­fering passengers plenty of space and a spec­tacular view through the panoramic windows.

GD10

Ropeway type

3.000

Throughput per hour

6,0 m/s

Speed

Höllental

Graun im Vinschgau - Curon Venosta – Italy – 2018

The creation of a unified ski area is of enor­mous importance for the Reschenpass tourist region. As a recreational area, the destina­tion focuses equally on families, sport and nature enthusiasts. In addition to the “GD10 St. Valentin – Schöneben”, the “GD10 Höllen­tal” makes it possible to travel onwards from the upper station in Schöneben. This gives access to the Höllental piste and from there to the new connecting piste to the middle station of the “GD10 St. Valentin-Schöneben”. Connecting the two ski areas means that the strengths of Schöneben in winter and of Haideralm in summer can be optimally shared.

GD10

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Colbricon Express

San Martino di Castrozza – Italy – 2018

San Martino di Castrozza – Passo Rolle is a ski resort in Trentino and part of the “Dolomiti Superski” area. Here, winter sports enthusiasts are transported even more quickly thanks to a new 10-passenger gondola lift. Skiers can reach Valbonetta from San Martino di Castrozza in only six minutes.

GD10

Ropeway type

2.400

Throughput per hour

6,0 m/s

Speed

Press

Press area

Italy’s ski areas rely heavily on modern gondola lift projects

5 Downloads available


Related news

More interesting articles

ROPERA®: Digital Solutions for Efficient Ropeway Operations

19.11.2026

New Operations & Technology Hub

20.10.2026

LEITNER is setting new standards for the future of ropeways in Austria

02.07.2026

LEITNER’s first ROPERA® system in Switzerland is coming to Zermatt

23.06.2026

Above the traffic jams: LEITNER expands Mexico’s ropeway network by a furth...

09.06.2026

LEITNER inaugurates a new client training center in Ratschings

11.05.2026

LEITNER’s innovation push: ROPERA® impresses experts at Mountain Planet 202...

16.04.2026

Innovative Premiere: From 2027, the world’s first aerial tramway with Direc...

17.03.2026

LEITNER launches major technology initiative at Mountain Planet 2026

05.03.2026

LEITNER ropeways are setting new trends in many regions of Europe

20.02.2026

Download files

General Terms and Conditions

By using this content, you agree to the Terms of Use as well as to providing correct copyright attribution.

Download files

Download