Skip to main content
Back

Last updated 04.11.2022

Austria looks forward to a winter of ropeway upgrades with LEITNER

Diamond Evo cabin with red frame and ski racks for Galsterberg
LEITNER will be giving Austria’s forthcoming ski season an ultra-modern start with no fewer than eight new ropeways. The company is deploying the full breadth of its considerable portfolio to deliver the right infrastructure for every kind of use, from 10-passenger gondola lifts to Telemix systems.

A key component in all this is the LEITNER DirectDrive, which, because it’s so maintenance-friendly and easy on resources, provides important added sustainability. LEITNER DirectDrive uses up to five percent less electricity than conventional systems.

The new GD10 Hössbahn will be completed in time for this year’s Christmas celebrations in Hinterstoder. The 10-passenger gondola lift will run parallel to the existing ropeway, which will be removed after the summer season and replaced in time for winter by the new ropeway onto the Höss.

Situated at the popular World Cup venue in the region of Pyhrn-Priel, this lift features Diamond EVO cabins with automatic sliding doors, providing more legroom as well as ski quivers on the inside.

LEITNER is currently building a new 10-passenger gondola lift on the Galsterberg in the Schladming-Dachstein region. It will begin operation by the end of the year. Equipped with a LEITNER DirectDrive, the GD10 Galsterberg is set to replace an over thirty year old group gondola lift. This means a significant upgrade for winter sports enthusiasts.

Spacious Diamond EVO cabins in the XL Deep version feature separate upholstered seats and lots of legroom, making things really comfy for passengers. Big glass sides all round provide an exceptional panoramic view of the surrounding mountains.

The holiday region of Murtal will also be kitted out with LEITNER’s latest ropeway technology this coming winter. The new GD10 Greben10 at the Grebenzen – St. Lambrecht ski resort will be completed by mid-December. This ropeway will carry a maximum of 2,100 passengers per hour and will offer the ultimate in comfort too, with its 65 Diamond cabins.

Designed by Pininfarina, these cabins have large glass sides all round offering an uninterrupted panoramic view, and will carry visitors up the Grebenzen at six meters per second.

Rittisberg in Styria is a popular family destination in winter, LEITNER is currently finishing work there on a new Telemix ropeway called the TMX6-10 Rittisberg. Thanks to its 3-in-1 technology, it will be operable as a gondola lift, a chairlift, or a combination of both. Timed to coincide with the ski resort’s 50th anniversary, this far-sighted eight million euro investment means a significant upgrade, including much greater flexibility and performance.

Four new LEITNER ropeways at major ski destinations in Tyrol

A comprehensive modernization program will start this year at the former Olympic venue of Axamer Lizum, close to the state capital of Innsbruck. A new gondola lift will be built over two sections up to a new top station, which is being erected right next to the existing Hoadlhaus.

The GD10 Hoadlbahn has 75 Diamond EVO 10-passenger cabins. It comprises three Pininfarina-designed premium stations and runs over a total length of 2,030 meters. The DirectDrive system developed by LEITNER will mean even greater sustainability, less maintenance, and the ultimate in noise reduction.

LEITNER expertise is being deployed again in the Zillertal tourism region this season. At Stummerberg, the CD8C Kapaunsbahn, with a LEITNER DirectDrive, is replacing an existing ropeway built in 1993. The new ropeway will lead right up to the 2,500 meter summit of the Übergangsjoch, thanks to its extended routing.

By changing the configuration of the surrounding ski runs, the new ropeway will make this part of the Zillertal Arena and its 147 kilometers of slopes much more attractive.

From this winter, a new 6-seater chairlift built by LEITNER will provide maximum comfort at the Defereggen Valley resort. The CD6C Leppleskofel, which ascends to nearly 2,700 meters above sea level, is East Tyrol’s highest ropeway system and offers especially impressive levels of comfort.

LEITNER DirectDrive, premium seats, and weather bubbles mean sustainable efficiency and relaxed travel, whatever the conditions.

From December 2022, the new CD6C Hornbahn 2000 6-seater chairlift at the Ski Juwel Alpbachtal Wildschönau resort will replace its predecessor, which was a 4-seater. The modern, detachable ropeway will carry up to 2,600 people over a length of nearly 1,100 meters, with weather protection, to the Top of Alpbachtal station in under four minutes. The focus at Alpbachtal has clearly been on quality rather than quantity, with features that include LEITNER DirectDrive, heated seats, and weather bubbles. This is an investment aimed not at expansion, but at improving the quality of people’s experience on the mountain.

References

Discover the installation in detail

Hornbahn 2000

Alpbach – Austria – 2022

The new CD6C Hornbahn 2000 6-seater chairlift has replaced its 4-seater predecessor at Ski Juwel Alpbachtal Wildschönau. This modern, detachable chairlift carries up to 2600 people over a distance of nearly 1100 meters, with weather protection, to the Top of Alpbachtal station in under four minutes. High-end equipment, including LEITNER DirectDrive, heated seats, and weather bubbles, means the focus in Alpbachtal is very much on quality rather than quantity. This replacement investment was not aimed at expansion, but on improving the quality of the mountain experience. That includes the new Top of Alpbachtal attraction, which can be reached on the Hornbahn 2000. The new top station, with its observation tower, platform and modern premises, has become a new focal point for the entire region.

CD6C

Ropeway type

2.600

Throughput per hour

5,0 m/s

Speed

Greben10

St. Lambrecht – Austria – 2022

At the ski resort of Grebenzen – St. Lambrecht, the new GD10 Greben10 replaces one chairlift and two surface lifts, reducing journey times by around 30 minutes. Faster travel benefits all the skiers who use the training slope in Grebenzen (which is open throughout the winter) for training, competitions, and races.The ropeway has a maximum transport capacity of 2100 people per hour and delivers maximum comfort with 65 Diamond cabins. Designed by Pininfarina, these have large glass sides all round, offering an uninterrupted panoramic view, and carries visitors at six meters per second.

GD10

Ropeway type

2.100

Throughput per hour

6,0 m/s

Speed

Hössbahn

Hinterstoder – Austria – 2022

Situated at the popular World Cup venue in the region of Pyhrn-Priel, Austria’s highest ropeway project to date, the new GD10 Hössbahn, features Diamond EVO cabins with automatic sliding doors, providing more legroom as well as ski quivers on the inside. The bottom station, which features high capacity loading, has a longer layout, making boarding easier, and is integrated into a multifunctional building that includes checkouts, management offices, public bathroom facilities, and a first-aid room. The ropeway is accessed via the second floor, which passengers can reach across a bridge or using escalators, stairs, or an elevator. The top station has been equipped with one of the powerful and most powerful LEITNER DirectDrives, the LD10, on account of the ropeway’s high capacity and the 811 meters it has to ascend. Around 3200 passengers per hour – 800 more than the old ropeway – are now carried up the mountain in two and a half minutes less time.

GD10

Ropeway type

3.195

Throughput per hour

6,5 m/s

Speed

Press

Press area

Austria looks forward to a winter of ropeway upgrades with LEITNER

8 Downloads available


Related news

More interesting articles

ROPERA®: Digital Solutions for Efficient Ropeway Operations

19.11.2026

New Operations & Technology Hub

20.10.2026

LEITNER is setting new standards for the future of ropeways in Austria

02.07.2026

LEITNER’s first ROPERA® system in Switzerland is coming to Zermatt

23.06.2026

Above the traffic jams: LEITNER expands Mexico’s ropeway network by a furth...

09.06.2026

LEITNER inaugurates a new client training center in Ratschings

11.05.2026

LEITNER’s innovation push: ROPERA® impresses experts at Mountain Planet 202...

16.04.2026

Innovative Premiere: From 2027, the world’s first aerial tramway with Direc...

17.03.2026

LEITNER launches major technology initiative at Mountain Planet 2026

05.03.2026

LEITNER ropeways are setting new trends in many regions of Europe

20.02.2026

Download files

General Terms and Conditions

By using this content, you agree to the Terms of Use as well as to providing correct copyright attribution.

Download files

Download