Visit us at the Interalpin

You will experience these topics very closely and live:

THE LEITNER 2S SYSTEM

The exclusive new developments employed in LEITNER’s bi-cable unidirectional ropeway are a symbiosis of its 1S and 3S technology, so they combine the best of both worlds. The main advantages of the system are less noise, reduced maintenance requirements, and a longer service life.

New Leitner stations
New Leitner stations

An additional result of the symbiosis between the tried-and-tested 1S and 3S technology is the station design. The stations are tilted by three degrees to best harness downhill forces. As a consequence, less energy is required when accelerating and decelerating cabins. The stations can therefore be designed to be more compact and space-saving.

AUGMENTING EXISTING STRENGTHS
AUGMENTING EXISTING STRENGTHS

Based on monocable lift technology that has been tried-and-tested for many years, LEITNER has integrated the acceleration and deceleration mechanisms, hauling rope deflection, and drive and deflection units into the new 2S technology.

Mobile support
Mobile support

Another innovation is the mobile support for the hauling rope. These limit the slack in the hauling rope in very uncommon scenarios involving very long spans. The mobile supports are positioned along the line during the automatic garaging process and automatically returned to the magazine when the vehicles are taken out of the garage again and moved onto the line. This innovative solution has some major benefits for the operation and maintenance of ropeways.

Perfected bike transport for chairlifts and gondola lifts

Today, more than ever before, ropeways have to impress for their maximum functionality for all types of use. LEITNER, with its two new systems for chair and gondola lifts, is now setting the standard for flexibility, safety and comfort for all those who want to enjoy the mountains on two wheels.

Bike transport for chairlifts
Bike transport for chairlifts

The bike transport extension kit is available for chairs without bubbles and can be mounted quickly and easily. The bike rack is attached to the frame of the chair. This means that the chair is perfectly balanced without any cross-swing. The CE-certified aluminum structure enables up to 5 bikes to be transported per vehicle. The chair can be loaded up very quickly and easily, so passengers can carry out this step themselves. The same is true for unloading bikes on arrival at the top station. 

Bike transport for gondola lifts
Bike transport for gondola lifts

Simplest assembly and safe transport without loss of conveying power: The new LEITNER bike transport for gondolas offers space for two bikes of any size and can be mounted effortlessly on all types of gondolas. Loading and unloading is easily handled by the passenger himself. Thanks to the retractable holder, the gondolas can be garaged as usual.

SYMPHONY and 10 luxury cabin

The SYMPHONY 10 luxury cabin by LEITNER is unique in every way. Unique features abound, from the unmistakable look of the Pininfarina-designed cabins, panoramic windows with 360° views and spacious passenger areas, right up to the finest interior fittings.

3S CABIN SYMPHONY
3S CABIN SYMPHONY
LUXURY CABIN SYMPHONY 10
LUXURY CABIN SYMPHONY 10

Certified digital logbook

The Logbook is the simple way to complete the legally required documentation for the operation of your ropeway. Gather together the different stations belonging to one ropeway in just one operating Logbook, eliminating the need for time-consuming document collation. 

HTI INNOVATION CORNER

As well as its latest products, we will be presenting a completely new impulse in innovation at INTERALPIN: the HTI Innovation Corner, where a number of HTI Group companies as well as external experts and customers will be holding a series of short presentations in Hall D. These will showcase unique innovations and best practice examples from the areas of sustainability and digitalization, as well as visions for the future.

Experts in Livetalk

Efficiency boost with the LEITNER DirectDrive

with Markus Stampfer
Project Manager LEITNER

Efficiency boost with the LEITNER DirectDrive

 


 


Wednesday, 19.04.2023 
from 15.45 - 16.30


 


Content: The successful reconstruction of the GD10 Danter + GD10 Cepies

Responsible planning - environmentally friendly operation

with Mag. Anton Bodner
Chairman of the Board Bergbahn AG Kitzbühel

Responsible planning - environmentally friendly operation

 


 


Thursday, 20.04.2023
from 15.00-15.45


 


Content: Best practice KitzSki

Autonomous and resource-saving - station operation with LeitPilot

with Andreas Dorfmann
CEO Kronplatzgroup


with Klaus Erharter
Technical Director of LEITNER AG

Autonomous and resource-saving - station operation with LeitPilot

 


 


Thursday, 20.04.2023
from 15.45-16.30 


 


 

HTI Innovation Corner Programme

LEITNER goes Metaverse - virtual review of the year

For the first time in the ropeway industry, we are offering visitors of the trade fair a special virtual experience in the form of a "Metaverse Year in Review" in the HTI Innovation Corner.


Metaverse hours:

Wednesday, 19.04: 10:00 - 13:15
Thursday, 20.04: 11:45 - 13:30
Friday, 21.04.: 10:00 - 14:00
 

Registration at the LEITNER Infopoint is required - limited number of participants!

Newsletter subscription

The top stories about our projects and products. Register now!